IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0525 # 06 Y:2018 06 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $124,618 $491,526 Not Implemented
LE0458 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,236 $500 Not Implemented
LE0458 # 02 Y:2018 02 2018 INSTALL TIMERS AND/OR THERMOSTATS $1,449 $150 Not Implemented
LE0458 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,024 $1,500 Implemented
LE0458 # 04 Y:2018 04 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,764 $1,200 Implemented
LE0458 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $744 $600 Implemented
LE0458 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,163 $3,019 Not Implemented
LE0458 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,058 $6,563 Implemented
LE0458 # 08 Y:2018 08 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,352 $22,000 Not Implemented
MI0339 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,225,133 $10,935,180 Implemented
MI0339 # 02 Y:2018 02 2018 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $279,023 $250,000 Not Implemented
MI0339 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $254,041 $3,280 Not Implemented
MI0339 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95,116 $69,861 Implemented
MI0339 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $47,520 $480 Not Implemented
MI0339 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,278 $2,030 Implemented
MI0339 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $28,281 $41,300 Not Implemented
MI0339 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $11,795 $9,000 Not Implemented
AS0456 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,722 $320 Implemented
AS0456 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,727 $13,500 Not Implemented
AS0456 # 03 Y:2018 03 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $46,649 $220,160 Not Implemented
AS0456 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $30,900 $16,614 Not Implemented
AS0456 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,670 $51,257 Not Implemented
AS0456 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82,206 $176,400 Implemented
AS0456 # 07 Y:2018 07 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,546 $0 Not Implemented
WV0562 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $2,979 $1,328 Implemented