IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CC0006 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,027 $5,000 n/a
CC0006 # 02 Y:2022 02 2022 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $18,077 $60,000 n/a
CC0006 # 03 Y:2022 03 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $51,588 $175,000 n/a
CC0006 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,854 $13,360 n/a
CC0006 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,461 $10,000 n/a
AM0856 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,035 $2,100 Not Implemented
AM0856 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $9,360 $0 Implemented
AM0856 # 03 Y:2022 03 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,410 $1,000 Implemented
AM0856 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,745 $2,528 Not Implemented
AM0856 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $1,790 $2,520 Not Implemented
AM0856 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $675 $1,275 Not Implemented
AM0856 # 07 Y:2022 07 2022 PAY UTILITY BILLS ON TIME $545 $0 Not Implemented
CW0124 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,407 $100 n/a
CW0124 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,378 $47,373 n/a
CW0124 # 03 Y:2022 03 2022 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $230,341 $287,555 n/a
CW0124 # 04 Y:2022 04 2022 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $7,380 $0 n/a
CW0124 # 05 Y:2022 05 2022 MODIFY WORKLOAD $16,860 $0 n/a
CW0124 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $929 $1,866 n/a
CW0124 # 07 Y:2022 07 2022 REPLACE TREATED WATER WITH WELL / SURFACE WATER $1,505 $2,582 n/a
UL2211 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $15,000 Not Implemented
UL2211 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,806 $20,000 Not Implemented
UL2211 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,815 $0 Implemented
UL2211 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $61,887 $45,461 Implemented
UL2211 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $96,458 $783,531 Not Implemented
UL2211 # 06 Y:2022 06 2022 USE SOLAR HEAT TO HEAT WATER $60,938 $150,000 Not Implemented