IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0567 # 01 Y:2021 01 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $123,727 $246,613 Implemented
UF0567 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,985 $228,343 Implemented
UF0567 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,803 $42,764 Implemented
UF0567 # 04 Y:2021 04 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,372 $14,250 Implemented
UF0567 # 05 Y:2021 05 2021 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $1,402 $0 Not Implemented
UF0567 # 06 Y:2021 06 2021 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,719,160 $106,000 Not Implemented
UF0567 # 07 Y:2021 07 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,760 $8,000 Not Implemented
UF0567 # 08 Y:2021 08 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $5,867 $0 Implemented
LS2117 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,901 $25 Not Implemented
LS2117 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,670 $75 Implemented
LS2117 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,638 $675 Implemented
LS2117 # 04 Y:2021 04 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,552 $300 Implemented
LS2117 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $504 $100 Implemented
LS2117 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,700 $4,332 Implemented
LS2117 # 07 Y:2021 07 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $79,003 $63,000 Implemented
LS2117 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $318 Not Implemented
LS2117 # 09 Y:2021 09 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $264 $1,400 Not Implemented
LS2117 # 10 Y:2021 10 2021 OPTIMIZE PLANT POWER FACTOR $885 $6,048 Not Implemented
TT0257 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $185,939 $360 Implemented
TT0257 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,293 $0 Implemented
TT0257 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,982 $7,100 Not Implemented
TT0257 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,957 $12,180 Not Implemented
TT0257 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $3,100 Implemented
LS2116 # 01 Y:2021 01 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,222 $300 Implemented
LS2116 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $4,408 $250 Implemented