IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,920

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0249 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,071 $325 Not Implemented
TT0249 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,717 $5,000 Not Implemented
TT0249 # 07 Y:2021 07 2021 MINIMIZE WATER USAGE $846 $1,753 Not Implemented
UF0563 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $24,451 $95,589 Not Implemented
UF0563 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,895 $3,125 Implemented
UF0563 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,163 $0 Implemented
UF0563 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,026 $406 Implemented
UF0563 # 05 Y:2020 05 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,582 $735 Implemented
UF0563 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $951 $0 Implemented
OK1042 # 01 Y:2021 01 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,084 $813 Not Implemented
OK1042 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,703 $0 Implemented
OK1042 # 03 Y:2021 03 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $178 $308 Not Implemented
OK1042 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $303 $1,200 Not Implemented
AS0503 # 01 Y:2021 01 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $316,547 $4,413,360 Implemented
AS0503 # 02 Y:2021 02 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $82,856 $1,837 Not Implemented
AS0503 # 03 Y:2021 03 2021 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,467 $918 Implemented
AS0503 # 04 Y:2021 04 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,634 $115 Implemented
AS0503 # 05 Y:2021 05 2021 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $25,372 $918 Implemented
AS0503 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,834 $5,555 Implemented
AS0503 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $9,147 $2,290 Implemented
AS0503 # 08 Y:2021 08 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,438 $14,828 Implemented
AS0503 # 09 Y:2021 09 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,192 $434 Not Implemented
LS2008 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $25 Implemented
LS2008 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,491 $1,125 Implemented
LS2008 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $188 $50 Not Implemented