Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0963 # 13 Y:2017 | 13 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $402 | $630 | Not Implemented |
AM0725 # 01 Y:2017 | 01 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,400 | $262,500 | Implemented |
AM0725 # 02 Y:2017 | 02 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $27,250 | $15,000 | Implemented |
AM0725 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,880 | $1,000 | Implemented |
AM0725 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,640 | $13,720 | Implemented |
AM0725 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,890 | $2,060 | Implemented |
AM0725 # 06 Y:2017 | 06 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $730 | $0 | Implemented |
AM0725 # 07 Y:2017 | 07 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $350 | $270 | Implemented |
AM0725 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $310 | $130 | Implemented |
SF0496 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $852 | $90 | Not Implemented |
SF0496 # 02 Y:2017 | 02 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,991 | $546 | Implemented |
SF0496 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,454 | $23,168 | Implemented |
SF0496 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,681 | $3,001 | Implemented |
SF0496 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,437 | $21,315 | Not Implemented |
SF0496 # 06 Y:2017 | 06 | 2017 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,855 | $20,327 | Not Implemented |
SF0496 # 07 Y:2017 | 07 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $169,204 | $790,554 | Not Implemented |
OR0683 # 01 Y:2017 | 01 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $19,831 | $19,940 | Implemented |
OR0683 # 02 Y:2017 | 02 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $16,054 | $2,000 | Not Implemented |
OR0683 # 03 Y:2017 | 03 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,107 | $670 | Implemented |
OR0683 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,828 | $17,274 | Not Implemented |
OR0683 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,688 | $32,940 | Not Implemented |
OR0683 # 06 Y:2017 | 06 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,456 | $10,125 | Not Implemented |
OR0683 # 07 Y:2017 | 07 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,866 | $5,700 | Not Implemented |
LE0429 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,498 | $1,000 | Not Implemented |
LE0429 # 02 Y:2017 | 02 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $18,942 | $7,500 | Not Implemented |