IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0158 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,437 $101,347 Implemented
MI0158 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $92,023 $8,580 Implemented
MI0157 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,435 $1,210 Not Implemented
MI0157 # 09 Y:2007 09 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,765 $3,475 Not Implemented
MI0157 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $40 Not Implemented
MI0157 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,172 $1,210 Not Implemented
MI0157 # 06 Y:2007 06 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,802 $3,475 Not Implemented
MI0157 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,639 $40 Not Implemented
MI0157 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $1,210 Not Implemented
MI0157 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,187 $40 Not Implemented
MI0157 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,557 $1,210 Not Implemented
MI0157 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91,892 $111,815 Not Implemented
MA0626 # 06 Y:2007 06 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $395 $200 Not Implemented
MA0626 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,602 $5,481 Not Implemented
MA0626 # 04 Y:2007 04 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $3,465 $2,500 Not Implemented
MA0626 # 03 Y:2007 03 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,346 $0 Not Implemented
MA0626 # 02 Y:2007 02 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,543 $8,000 Not Implemented
MA0626 # 01 Y:2007 01 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $67,278 $157,500 Not Implemented
UA0012 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,429 $1,230 Not Implemented
UA0012 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $737 $7,504 Not Implemented
UA0012 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,620 $9,817 Not Implemented
UA0012 # 03 Y:2007 03 2007 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $1,063,171 $5,532,000 Not Implemented
UA0012 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,165 $0 Implemented
UA0012 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,155 $700 Implemented
TT0014 # 05 Y:2007 05 2007 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $159,283 $2,912 Implemented