IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,707

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0089 # 05 Y:1997 05 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $8,273 $7,500 Not Implemented
DS0089 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,641 $2,315 Implemented
DS0087 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,061 $60 Implemented
DS0087 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,586 $10,503 Not Implemented
DS0087 # 03 Y:1997 03 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $675 $100 Not Implemented
DS0087 # 04 Y:1997 04 1997 USE A RAG RECYCLE SERVICE $2,250 $750 Implemented
DS0087 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,009 $4,500 Not Implemented
DS0087 # 06 Y:1997 06 1997 CONVERT TO ELECTROSTATIC POWDER COATING $3,515 $6,000 Implemented
DS0087 # 07 Y:1997 07 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $57,278 $44,580 Not Implemented
DS0086 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $6,948 $3,808 Implemented
DS0086 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $960 $0 Implemented
DS0086 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $1,477 $2,969 Implemented
DS0086 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,631 $450 Implemented
DS0086 # 05 Y:1997 05 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $14,841 $17,500 Not Implemented
DS0086 # 06 Y:1997 06 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $17,888 $10,590 Implemented
DS0086 # 07 Y:1997 07 1997 PAY UTILITY BILLS ON TIME $2,645 $0 Implemented
DS0086 # 08 Y:1997 08 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,212 $450 Implemented
DS0084 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,568 $775 Implemented
DS0084 # 02 Y:1997 02 1997 RECOVER WASTE HEAT FROM EQUIPMENT $8,121 $17,000 Not Implemented
DS0084 # 03 Y:1997 03 1997 BURN WASTE OIL FOR HEAT $1,528 $2,250 Not Implemented
DS0084 # 04 Y:1997 04 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,193 $6,000 Not Implemented
DS0084 # 05 Y:1997 05 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $98 $275 Not Implemented
DS0084 # 06 Y:1997 06 1997 INCREASE USE OF AUTOMATION $147,820 $160,000 Implemented
DS0085 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,039 $2,054 Implemented
DS0085 # 02 Y:1997 02 1997 REPAIR AND ELIMINATE STEAM LEAKS $16,781 $3,200 Implemented