IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0354 # 01 Y:1999 01 1999 CLOSE OFF UNNEEDED STEAM LINES $5,250 $950 Implemented
OR0354 # 02 Y:1999 02 1999 USE MINIMUM STEAM OPERATING PRESSURE $560 $0 Not Implemented
OR0354 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $750 $500 Implemented
OR0354 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $2,049 Implemented
OR0354 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $950 $0 Not Implemented
OR0353 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,608 $800 Implemented
OR0353 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $1,927 $5,600 Implemented
OR0353 # 03 Y:1999 03 1999 COMBINE UTILITY METERS $6,746 $20,000 Not Implemented
OR0352 # 01 Y:1999 01 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $60,160 $81,250 Not Implemented
OR0352 # 02 Y:1999 02 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,270 $3,200 Not Implemented
OR0352 # 03 Y:1999 03 1999 OPTIMIZE PLANT POWER FACTOR $9,819 $8,400 Not Implemented
OR0352 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $3,970 $950 Not Implemented
OR0352 # 05 Y:1999 05 1999 COVER OPEN TANKS $1,940 $870 Not Implemented
OR0352 # 06 Y:1999 06 1999 COVER OPEN TANKS $2,130 $5,385 Not Implemented
OR0352 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,430 $0 Not Implemented
OR0351 # 01 Y:1999 01 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,756 $0 Not Implemented
OR0351 # 02 Y:1999 02 1999 AVOID FROST FORMATION ON EVAPORATORS $31,270 $48,000 Not Implemented
OR0351 # 03 Y:1999 03 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,590 $0 Implemented
OR0351 # 04 Y:1999 04 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,270 $3,100 Not Implemented
OR0351 # 05 Y:1999 05 1999 OPTIMIZE PLANT POWER FACTOR $1,595 $9,600 Not Implemented
OR0350 # 01 Y:1999 01 1999 MODIFY CURRENT INCENTIVE PROGRAM $23,000 $13,300 Not Implemented
OR0350 # 02 Y:1999 02 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,264 $16,230 Not Implemented
OR0350 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $2,030 $1,150 Not Implemented
OR0350 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $167 $600 Not Implemented
OR0348 # 01 Y:1999 01 1999 INCREASE USE OF AUTOMATION $142,000 $35,600 Not Implemented