Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0583 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $1,265 | $582 | Implemented |
WV0583 # 09 Y:2019 | 09 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $507 | $270 | Implemented |
CL1913 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,521 | $22,682 | Implemented |
CL1913 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,987 | $32,413 | Implemented |
CL1913 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,338 | $12,000 | Not Implemented |
CL1913 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $162,118 | $350,000 | Not Implemented |
CL1913 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $92,958 | $400,000 | Not Implemented |
IP0123 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $286 | $7 | Implemented |
IP0123 # 02 Y:2019 | 02 | 2019 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $248 | $0 | Implemented |
IP0123 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $442 | $70 | Implemented |
IP0123 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $503 | $100 | Not Implemented |
IP0123 # 05 Y:2019 | 05 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,980 | $440 | Implemented |
IP0123 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $5,541 | $9,685 | Not Implemented |
IP0123 # 07 Y:2019 | 07 | 2019 | INSULATE BARE EQUIPMENT | $96 | $200 | Not Implemented |
IP0123 # 08 Y:2019 | 08 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $758 | $2,290 | Implemented |
IP0123 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,165 | $13,663 | Implemented |
IP0123 # 10 Y:2019 | 10 | 2019 | INSULATE BARE EQUIPMENT | $153 | $692 | Not Implemented |
UU0153 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $48,728 | $423,632 | Not Implemented |
UU0153 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,902 | $205,000 | Implemented |
UU0153 # 03 Y:2019 | 03 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $22,776 | $146,977 | Not Implemented |
UU0153 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $5,443 | $502 | Not Implemented |
UU0153 # 05 Y:2019 | 05 | 2019 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,777 | $6,500 | Implemented |
UU0153 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $899 | $2,019 | Implemented |
UU0153 # 07 Y:2019 | 07 | 2019 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,444 | $400 | Implemented |
UA0213 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,484 | $31,859 | Not Implemented |