IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0142 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $311 $655 Implemented
AR0142 # 02 Y:1998 02 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $866 $0 Implemented
AR0142 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $186 Implemented
AR0142 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,472 $50 Implemented
AR0142 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $757 $652 Implemented
AR0142 # 06 Y:1998 06 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,263 $8,000 Not Implemented
AR0142 # 07 Y:1998 07 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $374 $210 Not Implemented
AR0142 # 08 Y:1998 08 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $97,959 $21,200 Not Implemented
OK0551 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $898 $80,000 Implemented
OK0551 # 02 Y:1998 02 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $29,885 $0 Not Implemented
OK0551 # 03 Y:1998 03 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,224 $9,700 Not Implemented
OK0551 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,304 $0 Implemented
OK0551 # 05 Y:1998 05 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,522 $0 Implemented
OK0550 # 01 Y:1998 01 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $100,207 $0 Not Implemented
OK0550 # 02 Y:1998 02 1998 REDESIGN PROCESS $26,768 $20,000 Not Implemented
OK0550 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,393 $1,945 Implemented
OK0550 # 04 Y:1998 04 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,343 $4,000 Implemented
OK0550 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $18,120 $0 Implemented
OK0550 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,888 $9,700 Not Implemented
OK0550 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,071 $8,400 Implemented
OK0550 # 08 Y:1998 08 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,920 $3,006 Not Implemented
OK0550 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $518 $1,610 Not Implemented
OK0550 # 10 Y:1998 10 1998 INSULATE BARE EQUIPMENT $197 $134 Implemented
AR0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,369 $100 Implemented
AR0141 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $463 $530 Not Implemented