IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,874

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0492 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,040 $6,460 Implemented
CO0492 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,280 $2,060 Not Implemented
CO0492 # 06 Y:2001 06 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,160 $3,610 Not Implemented
CO0492 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $0 Not Implemented
CO0487 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $11,370 $13,000 Not Implemented
CO0487 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,240 $18,000 Not Implemented
CO0487 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,950 $470 Implemented
CO0487 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,350 $60 Not Implemented
CO0487 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $0 Implemented
CO0487 # 06 Y:2001 06 2001 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $1,420 $1,150 Not Implemented
CO0483 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,160 $0 Implemented
CO0483 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $500 $1,000 Not Implemented
CO0483 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0483 # 04 Y:2001 04 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,810 $4,730 Implemented
CO0483 # 05 Y:2001 05 2001 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $1,930 $1,930 Not Implemented
CO0482 # 01 Y:2001 01 2001 IMPROVE COMBUSTION CONTROL CAPABILITY $5,120 $10,000 Not Implemented
CO0482 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,800 $700 Not Implemented
CO0482 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,100 $210 Implemented
CO0482 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $990 $370 Implemented
CO0482 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $900 $1,500 Not Implemented
CO0482 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $60 Implemented
CO0482 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $0 Not Implemented
CO0482 # 08 Y:2001 08 2001 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $16,420 $730 Not Implemented
CO0482 # 09 Y:2001 09 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $730 $2,000 Not Implemented
CO0482 # 10 Y:2001 10 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $64,110 $75,000 Not Implemented