IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0671 # 08 Y:1999 08 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $63,700 $96,450 Not Implemented
GT0671 # 09 Y:1999 09 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $15,000 $70,000 Not Implemented
ME0274 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $27,426 $27,050 n/a
ME0274 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,039 $14,259 n/a
ME0274 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $5,786 $14,670 n/a
ME0274 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,882 $825 n/a
ME0274 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,789 $7,571 n/a
ME0274 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,182 $500 n/a
ME0274 # 07 Y:1999 07 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $371 $980 n/a
ME0274 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $100 n/a
ME0274 # 09 Y:1999 09 1999 ELIMINATE/REDUCE AN OPERATION $16,433 $2,400 n/a
ME0274 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $1,674 $868 n/a
ME0274 # 11 Y:1999 11 1999 MINIMIZE WATER USAGE $120 $85 n/a
ND0335 # 01 Y:1999 01 1999 DEVELOP A REPAIR/REPLACE POLICY $13,184 $31,164 Implemented
ND0335 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,904 $9,101 Implemented
ND0335 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $511 $1,603 Implemented
ND0335 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $430 Implemented
ND0335 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $272 $120 Implemented
ND0335 # 06 Y:1999 06 1999 USE OPTIMUM TEMPERATURE $78 $10 Implemented
ND0335 # 07 Y:1999 07 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $51 $50 Implemented
UL0231 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,275 $101 Not Implemented
UL0231 # 02 Y:1999 02 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $757 $0 Not Implemented
UL0231 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $876 $0 Not Implemented
UL0231 # 04 Y:1999 04 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $36,750 $23,166 Not Implemented
WI0359 # 01 Y:1999 01 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $6,185 $7,500 Not Implemented