Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0410 # 11 Y:2010 | 11 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $145 | $440 | Not Implemented |
NC0407 # 01 Y:2010 | 01 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,128 | $60,000 | Implemented |
NC0407 # 02 Y:2010 | 02 | 2010 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $35,567 | $200,000 | Not Implemented |
NC0407 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,606 | $1,000 | Implemented |
NC0407 # 04 Y:2010 | 04 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,147 | $42,000 | Implemented |
NC0407 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $350 | $50 | Not Implemented |
NC0407 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,776 | $6,897 | Implemented |
MZ0051 # 01 Y:2010 | 01 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,697 | $1,160 | Not Implemented |
MZ0051 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,304 | $73,650 | Not Implemented |
MZ0051 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $2,823 | $2,850 | Not Implemented |
MZ0051 # 04 Y:2010 | 04 | 2010 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,580 | $1,800 | Not Implemented |
MZ0051 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,963 | $0 | Not Implemented |
MZ0051 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,408 | $0 | Not Implemented |
MZ0051 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $544 | $400 | Not Implemented |
MZ0051 # 08 Y:2010 | 08 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,123 | $800 | Not Implemented |
MZ0051 # 09 Y:2010 | 09 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,817 | $10,000 | Not Implemented |
SU0298 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,218 | $1,248 | Not Implemented |
SU0298 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $431 | $86 | Not Implemented |
SU0298 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $792 | $266 | Not Implemented |
SU0298 # 06 Y:2010 | 06 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $125 | $274 | Not Implemented |
SU0298 # 07 Y:2010 | 07 | 2010 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $35,873 | $81,798 | Not Implemented |
SU0298 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,123 | $45,613 | Not Implemented |
SU0298 # 09 Y:2010 | 09 | 2010 | OPTIMIZE PLANT POWER FACTOR | $4,349 | $17,933 | Not Implemented |
UD0821 # 01 Y:2010 | 01 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,575 | $300,000 | Implemented |
UD0821 # 02 Y:2010 | 02 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,610 | $25 | Implemented |