IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0595 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $679 $1,983 Implemented
SD0595 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,799 $8,000 Not Implemented
SD0595 # 05 Y:2020 05 2020 REPAIR AND ELIMINATE STEAM LEAKS $727 $600 Implemented
SD0595 # 06 Y:2020 06 2020 COVER OPEN TANKS $551 $818 Not Implemented
SD0594 # 01 Y:2020 01 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,740 $8,700 Not Implemented
SD0594 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,323 $11,533 Not Implemented
SD0594 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,863 $0 Not Implemented
SD0594 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $25,266 $0 Not Implemented
SF0555 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,084 $0 Implemented
SF0555 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $1,257 $1,080 Implemented
SF0555 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,734 $3,930 Implemented
SF0555 # 04 Y:2020 04 2020 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $450,171 $750,000 Not Implemented
SF0555 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,221 $33,106 Implemented
SF0555 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,764 $20,616 Implemented
SF0555 # 07 Y:2020 07 2020 REPLACE BOILER $14,667 $114,810 Implemented
SF0555 # 08 Y:2020 08 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $63,107 $268,469 Not Implemented
SF0554 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $80 Implemented
SF0554 # 02 Y:2020 02 2020 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $21,879 $20,311 Not Implemented
SF0554 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $386 $404 Not Implemented
SF0554 # 04 Y:2020 04 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,802 $5,638 Not Implemented
SF0554 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,099 $13,511 Implemented
SF0554 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $1,140 $1,577 Not Implemented
SF0554 # 07 Y:2020 07 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $871 $1,184 Implemented
SF0554 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $833 $1,245 Not Implemented
SF0554 # 09 Y:2020 09 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $632 $1,312 Implemented