Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0595 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $679 | $1,983 | Implemented |
SD0595 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,799 | $8,000 | Not Implemented |
SD0595 # 05 Y:2020 | 05 | 2020 | REPAIR AND ELIMINATE STEAM LEAKS | $727 | $600 | Implemented |
SD0595 # 06 Y:2020 | 06 | 2020 | COVER OPEN TANKS | $551 | $818 | Not Implemented |
SD0594 # 01 Y:2020 | 01 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,740 | $8,700 | Not Implemented |
SD0594 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,323 | $11,533 | Not Implemented |
SD0594 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,863 | $0 | Not Implemented |
SD0594 # 04 Y:2020 | 04 | 2020 | PAY UTILITY BILLS ON TIME | $25,266 | $0 | Not Implemented |
SF0555 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,084 | $0 | Implemented |
SF0555 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $1,257 | $1,080 | Implemented |
SF0555 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,734 | $3,930 | Implemented |
SF0555 # 04 Y:2020 | 04 | 2020 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $450,171 | $750,000 | Not Implemented |
SF0555 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,221 | $33,106 | Implemented |
SF0555 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,764 | $20,616 | Implemented |
SF0555 # 07 Y:2020 | 07 | 2020 | REPLACE BOILER | $14,667 | $114,810 | Implemented |
SF0555 # 08 Y:2020 | 08 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,107 | $268,469 | Not Implemented |
SF0554 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $80 | Implemented |
SF0554 # 02 Y:2020 | 02 | 2020 | USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS | $21,879 | $20,311 | Not Implemented |
SF0554 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $386 | $404 | Not Implemented |
SF0554 # 04 Y:2020 | 04 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,802 | $5,638 | Not Implemented |
SF0554 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,099 | $13,511 | Implemented |
SF0554 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $1,140 | $1,577 | Not Implemented |
SF0554 # 07 Y:2020 | 07 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $871 | $1,184 | Implemented |
SF0554 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $833 | $1,245 | Not Implemented |
SF0554 # 09 Y:2020 | 09 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $632 | $1,312 | Implemented |