IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

165,667

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0449 # 06 Y:1991 06 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $590 $0 Implemented
GT0449 # 07 Y:1991 07 1991 INSTALL TIMERS AND/OR THERMOSTATS $560 $600 Implemented
GT0450 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,780 $22,892 Not Implemented
GT0450 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269 $143 Not Implemented
GT0450 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $753 $300 Not Implemented
GT0450 # 04 Y:1991 04 1991 REDUCE EXCESS STEAM BLEEDING $2,230 $0 Not Implemented
GT0450 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $647 $0 Not Implemented
GT0450 # 06 Y:1991 06 1991 RECOVER WASTE HEAT FROM EQUIPMENT $641 $500 Not Implemented
HO0007 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $0 Not Implemented
HO0007 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $694 $1,180 Not Implemented
HO0007 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $547 $1,489 Not Implemented
HO0007 # 04 Y:1991 04 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,761 $0 Not Implemented
HO0007 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $187 $256 Not Implemented
HO0008 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $1,032 Implemented
HO0008 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,973 $742 Implemented
HO0008 # 03 Y:1991 03 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,555 $0 Implemented
HO0008 # 04 Y:1991 04 1991 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $235,098 $0 Implemented
HO0006 # 07 Y:1991 07 1991 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,687 $1,400 Implemented
HO0003 # 01 Y:1991 01 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,943 $2,140 Implemented
HO0003 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $334 $408 Implemented
HO0003 # 03 Y:1991 03 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,979 $10,470 Implemented
HO0003 # 04 Y:1991 04 1991 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $2,140 $3,036 Implemented
HO0003 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $6,280 $0 Implemented
HO0003 # 06 Y:1991 06 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $779 $0 Implemented
HO0003 # 07 Y:1991 07 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $457 $1,500 Implemented