Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
165,626
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0108 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $893 | $232 | Implemented |
WI0108 # 03 Y:1991 | 03 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,190 | $400 | Implemented |
WI0108 # 04 Y:1991 | 04 | 1991 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $487 | $250 | Implemented |
WI0108 # 05 Y:1991 | 05 | 1991 | INSTALL STORM WINDOWS AND DOORS | $758 | $2,514 | Implemented |
WI0108 # 06 Y:1991 | 06 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $53 | $190 | Implemented |
WI0108 # 07 Y:1991 | 07 | 1991 | INSULATE BARE EQUIPMENT | $271 | $117 | Implemented |
MO0016 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $164 | $45 | Implemented |
MO0016 # 02 Y:1991 | 02 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $440 | $1,095 | Implemented |
MO0016 # 03 Y:1991 | 03 | 1991 | INSTALL / REPAIR INSULATION ON STEAM LINES | $383 | $1,145 | Implemented |
MO0016 # 04 Y:1991 | 04 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $138 | $150 | Implemented |
MO0016 # 05 Y:1991 | 05 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $41 | $0 | Implemented |
MO0016 # 06 Y:1991 | 06 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $18 | $3 | Implemented |
MO0016 # 07 Y:1991 | 07 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $10 | $210 | Implemented |
MA0201 # 01 Y:1991 | 01 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 03 Y:1991 | 03 | 1991 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $159,131 | $425,925 | Not Implemented |
MA0201 # 04 Y:1991 | 04 | 1991 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,784 | $500 | Not Implemented |
MA0202 # 01 Y:1991 | 01 | 1991 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $458 | $1,012 | Implemented |
MA0202 # 02 Y:1991 | 02 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,469 | $2,800 | Implemented |
MA0202 # 03 Y:1991 | 03 | 1991 | INSULATE BARE EQUIPMENT | $196 | $0 | Implemented |
MA0202 # 04 Y:1991 | 04 | 1991 | REDUCE HEAT GAIN BY WINDOW TINTING | $9,467 | $37,380 | Implemented |
KU0331 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $628 | $395 | Not Implemented |
KU0331 # 02 Y:1991 | 02 | 1991 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $181 | $500 | Not Implemented |
KU0331 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $2,630 | $2,500 | Not Implemented |
KU0331 # 04 Y:1991 | 04 | 1991 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,445 | $10,200 | Not Implemented |