IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0299 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,301 $2,000 Implemented
TN0299 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,747 $165 Implemented
TN0299 # 04 Y:1987 04 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $453 $1,192 Implemented
TN0299 # 05 Y:1987 05 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,674 $930 Not Implemented
TN0299 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,555 $1,600 Not Implemented
TN0299 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,335 $360 Not Implemented
TN0299 # 08 Y:1987 08 1987 INSTALL SET-BACK TIMERS $1,176 $0 Implemented
TN0304 # 01 Y:1987 01 1987 INSULATE BARE EQUIPMENT $10,943 $650 Implemented
TN0304 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $2,510 $2,700 Not Implemented
TN0304 # 03 Y:1987 03 1987 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,630 $12,000 Not Implemented
TN0304 # 04 Y:1987 04 1987 INSTALL SET-BACK TIMERS $4,039 $0 Implemented
TN0304 # 05 Y:1987 05 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,637 $2,680 Implemented
TN0304 # 06 Y:1987 06 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,707 $0 Not Implemented
TN0304 # 07 Y:1987 07 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,174 $0 Not Implemented
TN0304 # 08 Y:1987 08 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $549 $94 Not Implemented
UD0223 # 01 Y:1987 01 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,084 $0 Implemented
UD0223 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,302 $131 Implemented
UD0223 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $809 $100 Implemented
UD0224 # 01 Y:1987 01 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,584 $0 Not Implemented
UD0224 # 02 Y:1987 02 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,048 $7,200 Not Implemented
UD0224 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $2,509 $6,000 Not Implemented
UD0224 # 04 Y:1987 04 1987 REDUCE GLAZED AREAS IN BUILDINGS $3,429 $5,800 Not Implemented
UD0224 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,313 $2,500 Implemented
UD0225 # 01 Y:1987 01 1987 OPTIMIZE PLANT POWER FACTOR $2,781 $2,200 Implemented
UD0225 # 02 Y:1987 02 1987 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,298 $1,000 Implemented