Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0239 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $18,178 | $2,000 | Implemented |
UU0239 # 03 Y:2024 | 03 | 2024 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $9,905 | $9,905 | Implemented |
UU0239 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $6,144 | $7,887 | Implemented |
UU0239 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,050 | $1,400 | Not Implemented |
UU0239 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,011 | $3,011 | Not Implemented |
UU0238 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,223 | $4,080 | Implemented |
UU0238 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,624 | $12,621 | Implemented |
UU0238 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,670 | $22,500 | Not Implemented |
UU0238 # 04 Y:2024 | 04 | 2024 | CLEAN CONDENSER TUBES | $3,894 | $3,890 | Implemented |
UU0238 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,731 | $5,916 | Implemented |
UU0230 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,018 | $26,647 | Implemented |
UU0230 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,818 | $12,930 | Implemented |
UU0230 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,861 | $1,200 | Implemented |
UU0230 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,277 | $2,970 | Implemented |
UU0230 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $4,607 | $4,819 | Implemented |
UU0230 # 06 Y:2023 | 06 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,985 | $11,730 | Not Implemented |
UU0230 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,123 | $20,174 | Implemented |
UU0230 # 08 Y:2023 | 08 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,790 | $1,000 | Implemented |
UU0230 # 09 Y:2023 | 09 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,682 | $2,000 | Not Implemented |
UU0230 # 10 Y:2023 | 10 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,460 | $1,000 | Implemented |
UU0230 # 11 Y:2023 | 11 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,121 | $33,692 | Not Implemented |
UU0231 # 01 Y:2023 | 01 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $19,636 | $127,500 | Not Implemented |
UU0231 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,519 | $14,890 | Implemented |
UU0231 # 03 Y:2023 | 03 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $6,518 | $19,160 | Implemented |
UU0231 # 04 Y:2023 | 04 | 2023 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,026 | $30,128 | Not Implemented |