IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0806 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,000 $59,670 Not Implemented
GT0806 # 08 Y:2005 08 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,300 $13,870 Not Implemented
GT0805 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $310 $253 Not Implemented
GT0805 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,451 $3,470 Not Implemented
GT0805 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,375 $5,705 Not Implemented
GT0805 # 04 Y:2005 04 2005 DISCONNECT BALLASTS $1,400 $700 Not Implemented
GT0805 # 05 Y:2005 05 2005 COMBINE UTILITY METERS $4,682 $7,000 Not Implemented
GT0805 # 06 Y:2005 06 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $23,800 $0 Not Implemented
GT0805 # 07 Y:2005 07 2005 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $11,117 $10,000 Not Implemented
GT0805 # 08 Y:2005 08 2005 REDESIGN PROCESS $74,195 $46,000 Not Implemented
GT0808 # 01 Y:2005 01 2005 REDUCE EXCESS STEAM BLEEDING $205,920 $22,000 Not Implemented
GT0808 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,498 $0 Implemented
GT0808 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $7,554 $3,000 Not Implemented
GT0808 # 04 Y:2005 04 2005 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $939 $360 Implemented
GT0808 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,091 $62,476 Implemented
GT0808 # 06 Y:2005 06 2005 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $16,309 $15,800 Not Implemented
GT0808 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $255 $350 Implemented
GT0808 # 08 Y:2005 08 2005 USE MINIMUM STEAM OPERATING PRESSURE $5,317 $0 Not Implemented
GT0803 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,764 $944 Implemented
GT0803 # 02 Y:2005 02 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $11,058 $1,000 Implemented
GT0803 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,504 $7,500 Implemented
GT0803 # 04 Y:2005 04 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $26,869 $3,000 Implemented
GT0803 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,965 $13,380 Not Implemented
GT0803 # 06 Y:2005 06 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,157 $27,000 Not Implemented
GT0803 # 07 Y:2005 07 2005 USE PHOTOCELL CONTROLS $2,516 $570 Implemented