IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,774

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0239 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $140 $360 Not Implemented
OK0239 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $584 $0 Implemented
RU0011 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $181 $46 Implemented
RU0011 # 02 Y:1987 02 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,642 $7,500 Not Implemented
RU0011 # 03 Y:1987 03 1987 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $163 $330 Implemented
RU0011 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $5,588 $5,004 Not Implemented
RU0012 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $302 $600 Implemented
RU0012 # 02 Y:1987 02 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,052 $3,750 Implemented
RU0012 # 03 Y:1987 03 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $568 $0 Not Implemented
RU0012 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $213 $82 Implemented
RU0012 # 05 Y:1987 05 1987 INSTALL TIMERS AND/OR THERMOSTATS $5,664 $2,800 Implemented
RU0012 # 06 Y:1987 06 1987 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $695 $710 Implemented
GT0331 # 01 Y:1987 01 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $588 $5,033 Implemented
GT0331 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,290 $9,915 Not Implemented
GT0331 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $768 $623 Implemented
GT0331 # 04 Y:1987 04 1987 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $12,449 $6,000 Not Implemented
GT0332 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $771 $1,786 Implemented
GT0332 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $226 $580 Implemented
GT0332 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,200 $300 Implemented
GT0332 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,070 $12,000 Implemented
GT0332 # 05 Y:1987 05 1987 HEAT WATER WITH EXHAUST HEAT $16,300 $5,800 Implemented
GT0332 # 06 Y:1987 06 1987 COVER OPEN TANKS $1,130 $2,000 Implemented
GT0333 # 01 Y:1987 01 1987 INSTALL SET-BACK TIMERS $6,040 $500 Implemented
GT0333 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $7,210 $500 Implemented
GT0333 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $840 $0 Implemented