Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,240
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0268 # 06 Y:1988 | 06 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $153 | $0 | Implemented |
KU0268 # 07 Y:1988 | 07 | 1988 | IMPROVE LUBRICATION PRACTICES | $153 | $0 | Implemented |
KU0268 # 08 Y:1988 | 08 | 1988 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,598 | $28 | Implemented |
KU0269 # 01 Y:1988 | 01 | 1988 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $17,859 | $10,000 | Not Implemented |
KU0269 # 02 Y:1988 | 02 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,858 | $0 | Implemented |
KU0269 # 03 Y:1988 | 03 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $5,967 | $5,600 | Implemented |
KU0269 # 04 Y:1988 | 04 | 1988 | INSTALL AUTOMATIC STACK DAMPER | $243 | $450 | Not Implemented |
KU0269 # 05 Y:1988 | 05 | 1988 | RECOVER AND REUSE COOLING WATER | $728 | $0 | Not Implemented |
KU0269 # 06 Y:1988 | 06 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $166 | $0 | Implemented |
KU0270 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,368 | $16,108 | Not Implemented |
KU0270 # 02 Y:1988 | 02 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,463 | $1,660 | Not Implemented |
KU0270 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,463 | $775 | Implemented |
KU0270 # 04 Y:1988 | 04 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,151 | $1,000 | Implemented |
KU0270 # 05 Y:1988 | 05 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $755 | $940 | Implemented |
KU0270 # 06 Y:1988 | 06 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,192 | $0 | Not Implemented |
KU0270 # 07 Y:1988 | 07 | 1988 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,329 | $7,575 | Implemented |
KU0270 # 08 Y:1988 | 08 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $4,749 | $15 | Not Implemented |
KU0270 # 09 Y:1988 | 09 | 1988 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,221 | $0 | Not Implemented |
KU0270 # 10 Y:1988 | 10 | 1988 | TREAT AND REUSE RINSE WATERS | $2,921 | $4,700 | Not Implemented |
GT0354 # 01 Y:1988 | 01 | 1988 | INSTALL SET-BACK TIMERS | $10,948 | $1,800 | Not Implemented |
GT0354 # 02 Y:1988 | 02 | 1988 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,524 | $10,400 | Not Implemented |
GT0354 # 03 Y:1988 | 03 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,340 | $5,950 | Not Implemented |
GT0354 # 04 Y:1988 | 04 | 1988 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $25,532 | $80,640 | Not Implemented |
GT0355 # 01 Y:1988 | 01 | 1988 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,437 | $7,830 | Not Implemented |
GT0355 # 02 Y:1988 | 02 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $535 | $300 | Implemented |