IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

165,609

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0373 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,407 $540 Implemented
AM0067 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,911 $6,400 Not Implemented
AM0067 # 02 Y:1989 02 1989 REPAIR AND ELIMINATE STEAM LEAKS $4,380 $800 Implemented
AM0067 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $3,860 $0 Implemented
AM0067 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,932 $175 Implemented
AM0067 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $800 Not Implemented
AM0067 # 07 Y:1989 07 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $154 $91 Not Implemented
AM0067 # 08 Y:1989 08 1989 INSTALL TIMERS AND/OR THERMOSTATS $285 $83 Not Implemented
AM0067 # 09 Y:1989 09 1989 CHECK FOR ACCURACY OF UTILITY / POWER METERS $94 $500 Not Implemented
AM0068 # 01 Y:1989 01 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,430 $24,600 Implemented
AM0068 # 02 Y:1989 02 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,210 $16,500 Implemented
AM0068 # 03 Y:1989 03 1989 INSTALL SET-BACK TIMERS $2,180 $0 Implemented
AM0068 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $890 $1,000 Implemented
AM0068 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $347 $97 Implemented
AM0068 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $295 Implemented
MA0152 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,378 $527 Implemented
MA0152 # 02 Y:1989 02 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,925 $40,371 Not Implemented
MA0152 # 03 Y:1989 03 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,765 $2,300 Not Implemented
MA0152 # 04 Y:1989 04 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,320 $18,000 Not Implemented
MA0152 # 05 Y:1989 05 1989 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $208 $0 Implemented
MA0152 # 06 Y:1989 06 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $400 $0 Implemented
MA0153 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $632 $217 Not Implemented
MA0153 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $878 $163 Implemented
MA0153 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,825 $500 Implemented
MA0153 # 04 Y:1989 04 1989 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $19,722 $115,000 Not Implemented