IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

157,957

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0189 # 07 Y:1986 07 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $986 $2,550 Implemented
OK0189 # 08 Y:1986 08 1986 COVER OPEN TANKS $2,690 $533 Not Implemented
OK0190 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,326 $229 Implemented
OK0190 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $706 $80 Implemented
OK0190 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,318 $0 Implemented
OK0190 # 04 Y:1986 04 1986 OPTIMIZE PLANT POWER FACTOR $4,159 $12,400 Not Implemented
OK0190 # 05 Y:1986 05 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $388 $1,600 Not Implemented
OK0190 # 06 Y:1986 06 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,381 $0 Not Implemented
OK0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $0 Implemented
OK0191 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $721 $200 Implemented
OK0191 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $224 $92 Implemented
OK0191 # 04 Y:1986 04 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $349 $510 Not Implemented
OK0191 # 05 Y:1986 05 1986 USE RADIANT HEATER FOR SPOT HEATING $2,051 $7,950 Not Implemented
OK0192 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,426 $9,484 Not Implemented
OK0192 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,006 $1,225 Not Implemented
OK0192 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,057 $3,500 Implemented
OK0192 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,945 $7,768 Not Implemented
OK0192 # 05 Y:1986 05 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,547 $32,800 Implemented
OK0192 # 06 Y:1986 06 1986 BURN WASTE OIL FOR HEAT $3,391 $2,400 Not Implemented
OK0192 # 07 Y:1986 07 1986 RECOVER AND REUSE COOLING WATER $96,689 $52,800 Implemented
OK0187 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $277 $700 Implemented
OK0187 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $40 Implemented
OK0187 # 04 Y:1986 04 1986 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,104 $700 Not Implemented
OK0187 # 05 Y:1986 05 1986 USE RADIANT HEATER FOR SPOT HEATING $10,251 $54,400 Not Implemented
OK0187 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $103 Implemented