IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0631 # 13 Y:2001 13 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $421 $688 Implemented
UF0280 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $410 Implemented
UF0280 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,615 $7,198 Implemented
UF0280 # 03 Y:2001 03 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,000 $50 Implemented
UF0280 # 04 Y:2001 04 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,751 $25,263 Not Implemented
UF0280 # 05 Y:2001 05 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,972 $20,010 Not Implemented
UF0280 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,427 $8,000 Implemented
UF0280 # 07 Y:2001 07 2001 RECOVER AND REUSE WASTE MATERIAL $1,867 $534 Not Implemented
UF0280 # 08 Y:2001 08 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $117,000 $120,250 Not Implemented
UF0280 # 09 Y:2001 09 2001 $14,321 $4,612 Implemented
UU0009 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,515 $19,380 Implemented
UU0009 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,476 $18,287 Implemented
UU0009 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $3,538 $1,000 Implemented
UU0009 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $560 $650 Implemented
UU0009 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $1,276 $600 Implemented
LM0018 # 01 Y:2001 01 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,902 $8,000 Not Implemented
LM0018 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $724 $350 Implemented
LM0018 # 03 Y:2001 03 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,910 $11,800 Not Implemented
LM0018 # 04 Y:2001 04 2001 $7,800 $2,250 Implemented
LM0018 # 05 Y:2001 05 2001 $30,900 $8,000 Not Implemented
LM0018 # 06 Y:2001 06 2001 $1,174 $500 Not Implemented
MA0492 # 01 Y:2001 01 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $23,000 $10,000 Not Implemented
MA0492 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,800 $360 Implemented
MA0492 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,800 $15,000 Not Implemented
MA0492 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,160 $12,000 Not Implemented