Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0569 # 04 Y:2021 | 04 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,674 | $23,650 | Implemented |
SF0569 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $2,279 | $6,956 | Implemented |
SF0569 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $107,546 | $722,227 | Implemented |
SF0569 # 07 Y:2021 | 07 | 2021 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $143,550 | $77,720 | Implemented |
SD0607 # 01 Y:2021 | 01 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $26,888 | $500 | Not Implemented |
SD0607 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,809 | $38,800 | Not Implemented |
SD0607 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,885 | $2,100 | Not Implemented |
SD0607 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,753 | $568 | Not Implemented |
SD0607 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,289 | $2,741 | Not Implemented |
SD0607 # 06 Y:2021 | 06 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $794 | $760 | Not Implemented |
SD0607 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $481 | $706 | Not Implemented |
SD0607 # 08 Y:2021 | 08 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $487 | $540 | Not Implemented |
MZ0309 # 01 Y:2021 | 01 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $65,174 | $960 | Implemented |
MZ0309 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,714 | $960 | Implemented |
MZ0309 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,876 | $42,513 | Not Implemented |
MZ0309 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,649 | $4,200 | Implemented |
MZ0309 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,736 | $4,920 | Implemented |
MZ0309 # 06 Y:2021 | 06 | 2021 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $353,125 | $770,000 | Not Implemented |
MZ0309 # 07 Y:2021 | 07 | 2021 | OPTIMIZE PLANT POWER FACTOR | $354,701 | $442,138 | Implemented |
IC0246 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,458 | $4,300 | Not Implemented |
IC0246 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $433 | $214 | Not Implemented |
IC0246 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,948 | $40,000 | Not Implemented |
IC0246 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,527 | $1,200 | Not Implemented |
IC0246 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,840 | $544 | Not Implemented |
IP0147 # 01 Y:2021 | 01 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $528 | $0 | Not Implemented |