IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

157,906

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0247 # 01 Y:1985 01 1985 REDESIGN PROCESS $8,108 $2,000 Implemented
TN0247 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,753 $135 Implemented
TN0247 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $808 $500 Implemented
TN0248 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,966 $375 Implemented
TN0248 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,354 $4,000 Implemented
TN0248 # 03 Y:1985 03 1985 COVER OPEN TANKS $1,628 $800 Implemented
TN0248 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $1,044 $750 Implemented
TN0248 # 05 Y:1985 05 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $354 $399 Not Implemented
TN0248 # 06 Y:1985 06 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $967 $0 Implemented
TN0248 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $457 $500 Implemented
TN0249 # 01 Y:1985 01 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $3,085 $583 Implemented
TN0249 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,598 $0 Implemented
TN0249 # 03 Y:1985 03 1985 USE MINIMUM STEAM OPERATING PRESSURE $1,482 $0 Implemented
TN0249 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $984 $277 Implemented
TN0249 # 05 Y:1985 05 1985 COVER OPEN TANKS $843 $100 Not Implemented
TN0249 # 06 Y:1985 06 1985 INSULATE BARE EQUIPMENT $449 $172 Implemented
TN0249 # 07 Y:1985 07 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $138 $40 Implemented
TN0249 # 08 Y:1985 08 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $393 $1,350 Not Implemented
TN0259 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $31,022 $59,300 Not Implemented
TN0259 # 02 Y:1985 02 1985 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $13,198 $565 Implemented
TN0259 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,946 $1,000 Not Implemented
TN0259 # 04 Y:1985 04 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,582 $0 Implemented
TN0259 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $997 $108 Implemented
TN0259 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $426 $220 Not Implemented
AT0004 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $146 $311 Implemented