Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,008
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0234 # 02 Y:1987 | 02 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,993 | $8,000 | Not Implemented |
KU0234 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,345 | $4,000 | Implemented |
KU0234 # 04 Y:1987 | 04 | 1987 | INSTALL TURBULATORS | $4,336 | $6,311 | Not Implemented |
KU0234 # 05 Y:1987 | 05 | 1987 | IMPROVE LUBRICATION PRACTICES | $4,229 | $0 | Not Implemented |
KU0234 # 06 Y:1987 | 06 | 1987 | INSULATE BARE EQUIPMENT | $3,013 | $5,000 | Implemented |
KU0234 # 07 Y:1987 | 07 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,044 | $0 | Implemented |
KU0234 # 08 Y:1987 | 08 | 1987 | REPAIR AND ELIMINATE STEAM LEAKS | $1,504 | $140 | Implemented |
KU0234 # 09 Y:1987 | 09 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,385 | $0 | Implemented |
KU0234 # 10 Y:1987 | 10 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $544 | $400 | Implemented |
KU0234 # 11 Y:1987 | 11 | 1987 | TURN OFF EQUIPMENT WHEN NOT IN USE | $370 | $0 | Implemented |
KU0235 # 01 Y:1987 | 01 | 1987 | IMPROVE LUBRICATION PRACTICES | $11,769 | $0 | Not Implemented |
KU0235 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,844 | $0 | Implemented |
KU0235 # 03 Y:1987 | 03 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,582 | $400 | Implemented |
KU0235 # 04 Y:1987 | 04 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,242 | $4,000 | Implemented |
KU0235 # 05 Y:1987 | 05 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,629 | $0 | Not Implemented |
KU0235 # 06 Y:1987 | 06 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $935 | $1,800 | Not Implemented |
KU0235 # 07 Y:1987 | 07 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $784 | $1,275 | Not Implemented |
KU0235 # 08 Y:1987 | 08 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $524 | $0 | Not Implemented |
KU0235 # 09 Y:1987 | 09 | 1987 | INSULATE BARE EQUIPMENT | $643 | $150 | Not Implemented |
KU0235 # 10 Y:1987 | 10 | 1987 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $162 | $0 | Implemented |
KU0235 # 11 Y:1987 | 11 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $131 | $50 | Not Implemented |
KU0236 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,730 | $8,946 | Implemented |
KU0236 # 02 Y:1987 | 02 | 1987 | INSTALL AUTOMATIC STACK DAMPER | $1,183 | $1,700 | Not Implemented |
KU0236 # 03 Y:1987 | 03 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,055 | $0 | Implemented |
KU0236 # 04 Y:1987 | 04 | 1987 | IMPROVE LUBRICATION PRACTICES | $905 | $0 | Not Implemented |