IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163,717

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0015 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $531 $368 Implemented
RU0015 # 05 Y:1987 05 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,538 $3,132 Not Implemented
RU0015 # 06 Y:1987 06 1987 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,394 $800 Implemented
OK0241 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $6,525 Not Implemented
OK0241 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148 $71 Implemented
OK0241 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $297 $288 Implemented
OK0241 # 04 Y:1987 04 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,273 $1,050 Implemented
OK0241 # 05 Y:1987 05 1987 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $735 $2,083 Not Implemented
OK0241 # 06 Y:1987 06 1987 INSTALL TURBULATORS $108 $220 Implemented
OK0241 # 07 Y:1987 07 1987 INCREASE AMOUNT OF CONDENSATE RETURNED $82 $220 Implemented
OK0241 # 08 Y:1987 08 1987 INSTALL STEAM TRAP $612 $1,950 Implemented
OK0242 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $557,022 $852,179 Not Implemented
OK0242 # 02 Y:1987 02 1987 INSTALL SET-BACK TIMERS $3,249 $400 Implemented
OK0242 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $498 $209 Implemented
TN0324 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $300 Implemented
TN0324 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $906 $585 Implemented
TN0324 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,612 $4,800 Implemented
TN0324 # 04 Y:1987 04 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,386 $2,836 Not Implemented
TN0324 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $1,120 Implemented
TN0324 # 06 Y:1987 06 1987 ADJUST VENTS TO MINIMIZE ENERGY USE $967 $0 Implemented
TN0324 # 07 Y:1987 07 1987 IMPROVE LUBRICATION PRACTICES $951 $1,500 Not Implemented
TN0324 # 08 Y:1987 08 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $822 $1,360 Implemented
TN0324 # 09 Y:1987 09 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $192 Implemented
TN0324 # 10 Y:1987 10 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $139 $45 Not Implemented
TN0325 # 01 Y:1987 01 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $10,904 $421 Implemented