IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,592

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0163 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61 $0 Implemented
OK0163 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $110 $0 Implemented
OK0163 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $258 $139 Implemented
OK0163 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $83 $78 Implemented
OK0163 # 08 Y:1985 08 1985 INSTALL SET-BACK TIMERS $83 $45 Implemented
OK0163 # 09 Y:1985 09 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $27 $190 Not Implemented
OK0164 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,930 $891 Implemented
OK0164 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $47 Not Implemented
OK0164 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $1,900 $2,215 Implemented
OK0164 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $133 $150 Implemented
OK0164 # 05 Y:1985 05 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $314 $600 Implemented
MA0024 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $735 $378 Implemented
MA0024 # 02 Y:1985 02 1985 OPERATE BOILERS ON HIGH FIRE SETTING $2,731 $6,200 Implemented
MA0024 # 03 Y:1985 03 1985 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $17,848 $12,090 Not Implemented
MA0024 # 04 Y:1985 04 1985 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $6,406 $2,900 Implemented
KU0157 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,738 $2,752 Not Implemented
KU0157 # 02 Y:1985 02 1985 IMPROVE LUBRICATION PRACTICES $1,569 $290 Implemented
KU0157 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $4,000 Implemented
KU0157 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,550 Implemented
KU0157 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $759 $1,016 Implemented
KU0157 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,893 $1,500 Implemented
KU0157 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $899 $1,480 Implemented
KU0157 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $357 $0 Implemented
KU0157 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $745 $1,100 Implemented
TS0021 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $844 $326 Not Implemented