Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
158,592
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0163 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $61 | $0 | Implemented |
OK0163 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $110 | $0 | Implemented |
OK0163 # 06 Y:1985 | 06 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $258 | $139 | Implemented |
OK0163 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $83 | $78 | Implemented |
OK0163 # 08 Y:1985 | 08 | 1985 | INSTALL SET-BACK TIMERS | $83 | $45 | Implemented |
OK0163 # 09 Y:1985 | 09 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $27 | $190 | Not Implemented |
OK0164 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,930 | $891 | Implemented |
OK0164 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $304 | $47 | Not Implemented |
OK0164 # 03 Y:1985 | 03 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $1,900 | $2,215 | Implemented |
OK0164 # 04 Y:1985 | 04 | 1985 | TURN OFF EQUIPMENT WHEN NOT IN USE | $133 | $150 | Implemented |
OK0164 # 05 Y:1985 | 05 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $314 | $600 | Implemented |
MA0024 # 01 Y:1985 | 01 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $735 | $378 | Implemented |
MA0024 # 02 Y:1985 | 02 | 1985 | OPERATE BOILERS ON HIGH FIRE SETTING | $2,731 | $6,200 | Implemented |
MA0024 # 03 Y:1985 | 03 | 1985 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $17,848 | $12,090 | Not Implemented |
MA0024 # 04 Y:1985 | 04 | 1985 | BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED | $6,406 | $2,900 | Implemented |
KU0157 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,738 | $2,752 | Not Implemented |
KU0157 # 02 Y:1985 | 02 | 1985 | IMPROVE LUBRICATION PRACTICES | $1,569 | $290 | Implemented |
KU0157 # 03 Y:1985 | 03 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,260 | $4,000 | Implemented |
KU0157 # 04 Y:1985 | 04 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,889 | $1,550 | Implemented |
KU0157 # 05 Y:1985 | 05 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $759 | $1,016 | Implemented |
KU0157 # 06 Y:1985 | 06 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,893 | $1,500 | Implemented |
KU0157 # 07 Y:1985 | 07 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $899 | $1,480 | Implemented |
KU0157 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $357 | $0 | Implemented |
KU0157 # 09 Y:1985 | 09 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $745 | $1,100 | Implemented |
TS0021 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $844 | $326 | Not Implemented |