Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162,429
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0211 # 05 Y:1986 | 05 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $297 | $294 | Implemented |
OK0211 # 06 Y:1986 | 06 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,305 | $225 | Implemented |
OK0211 # 07 Y:1986 | 07 | 1986 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,220 | $3,500 | Not Implemented |
OK0211 # 08 Y:1986 | 08 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,395 | $1,500 | Implemented |
OK0211 # 09 Y:1986 | 09 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,017 | $14,850 | Implemented |
OK0211 # 10 Y:1986 | 10 | 1986 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,185 | $476 | Implemented |
OK0212 # 01 Y:1986 | 01 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,745 | $485 | Implemented |
OK0212 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,403 | $0 | Implemented |
OK0212 # 03 Y:1986 | 03 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $378 | $450 | Implemented |
OK0212 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,372 | $212 | Implemented |
OK0212 # 05 Y:1986 | 05 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,167 | $1,575 | Implemented |
OK0212 # 06 Y:1986 | 06 | 1986 | INSTALL SET-BACK TIMERS | $1,748 | $0 | Implemented |
OK0212 # 07 Y:1986 | 07 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,133 | $0 | Implemented |
CO0062 # 01 Y:1986 | 01 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,721 | $40 | Implemented |
CO0062 # 02 Y:1986 | 02 | 1986 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,638 | $9,200 | Implemented |
CO0062 # 03 Y:1986 | 03 | 1986 | USE RADIANT HEATER FOR SPOT HEATING | $7,549 | $15,000 | Not Implemented |
CO0062 # 04 Y:1986 | 04 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,765 | $3,300 | Not Implemented |
CO0062 # 05 Y:1986 | 05 | 1986 | IMPROVE LUBRICATION PRACTICES | $3,995 | $0 | Implemented |
CO0062 # 06 Y:1986 | 06 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $3,931 | $200 | Implemented |
CO0062 # 07 Y:1986 | 07 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,953 | $2,824 | Not Implemented |
CO0062 # 08 Y:1986 | 08 | 1986 | INSTALL TURBULATORS | $947 | $750 | Not Implemented |
CO0062 # 09 Y:1986 | 09 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $934 | $200 | Implemented |
CO0062 # 10 Y:1986 | 10 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $491 | $300 | Implemented |
CO0062 # 11 Y:1986 | 11 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $584 | $20 | Not Implemented |
CO0062 # 12 Y:1986 | 12 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,862 | $627 | Implemented |