Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,726
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0089 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $1,624 | $500 | Not Implemented |
MA0089 # 04 Y:1987 | 04 | 1987 | INSULATE BARE EQUIPMENT | $212 | $63 | Not Implemented |
MA0089 # 05 Y:1987 | 05 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,980 | $1,150 | Not Implemented |
MA0089 # 06 Y:1987 | 06 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,483 | $250 | Not Implemented |
MA0089 # 07 Y:1987 | 07 | 1987 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $654 | $180 | Not Implemented |
MA0089 # 08 Y:1987 | 08 | 1987 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $857 | $4,290 | Not Implemented |
LT0083 # 01 Y:1987 | 01 | 1987 | INSULATE BARE EQUIPMENT | $20,800 | $4,000 | Implemented |
LT0083 # 02 Y:1987 | 02 | 1987 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $12,143 | $0 | Not Implemented |
LT0083 # 03 Y:1987 | 03 | 1987 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,820 | $2,000 | Implemented |
LT0084 # 01 Y:1987 | 01 | 1987 | OPTIMIZE PLANT POWER FACTOR | $7,910 | $39,000 | Implemented |
LT0084 # 02 Y:1987 | 02 | 1987 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $420 | $0 | Implemented |
LT0084 # 03 Y:1987 | 03 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $344 | $0 | Not Implemented |
LT0084 # 04 Y:1987 | 04 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,200 | $1,200 | Implemented |
LT0084 # 05 Y:1987 | 05 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,656 | $1,300 | Implemented |
LT0084 # 06 Y:1987 | 06 | 1987 | KEEP BOILER TUBES CLEAN | $2,900 | $3,000 | Not Implemented |
LT0084 # 07 Y:1987 | 07 | 1987 | INSULATE BARE EQUIPMENT | $2,160 | $6,300 | Implemented |
LT0084 # 08 Y:1987 | 08 | 1987 | INSULATE BARE EQUIPMENT | $71,905 | $5,420 | Implemented |
UD0230 # 01 Y:1987 | 01 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,303 | $1,200 | Implemented |
UD0230 # 02 Y:1987 | 02 | 1987 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,952 | $50,000 | Implemented |
UD0230 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $607 | $12,500 | Implemented |
UD0231 # 01 Y:1987 | 01 | 1987 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $644 | $3,000 | Not Implemented |
UD0231 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,469 | $1,070 | Implemented |
UD0231 # 03 Y:1987 | 03 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,586 | $0 | Implemented |
UD0232 # 01 Y:1987 | 01 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,451 | $0 | Not Implemented |
UD0232 # 02 Y:1987 | 02 | 1987 | INSULATE BARE EQUIPMENT | $3,368 | $795 | Implemented |