Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162,359
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0200 # 04 Y:1986 | 04 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $473 | $0 | Implemented |
KU0200 # 05 Y:1986 | 05 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $198 | $0 | Implemented |
KU0200 # 06 Y:1986 | 06 | 1986 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $216 | $0 | Not Implemented |
KU0200 # 07 Y:1986 | 07 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $116 | $150 | Implemented |
CO0061 # 01 Y:1986 | 01 | 1986 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,180 | $675 | Implemented |
CO0061 # 02 Y:1986 | 02 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $2,701 | $4,000 | Implemented |
CO0061 # 03 Y:1986 | 03 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $673 | $3,000 | Implemented |
CO0061 # 04 Y:1986 | 04 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,929 | $1,500 | Not Implemented |
CO0061 # 05 Y:1986 | 05 | 1986 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,472 | $800 | Not Implemented |
CO0061 # 06 Y:1986 | 06 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $129 | $300 | Not Implemented |
CO0061 # 07 Y:1986 | 07 | 1986 | INSTALL TURBULATORS | $557 | $1,000 | Not Implemented |
CO0061 # 08 Y:1986 | 08 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $556 | $900 | Not Implemented |
CO0061 # 09 Y:1986 | 09 | 1986 | IMPROVE LUBRICATION PRACTICES | $689 | $0 | Implemented |
CO0061 # 10 Y:1986 | 10 | 1986 | INSULATE BARE EQUIPMENT | $695 | $620 | Implemented |
CO0061 # 11 Y:1986 | 11 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $160 | $150 | Implemented |
CO0061 # 12 Y:1986 | 12 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $419 | $100 | Not Implemented |
CO0061 # 13 Y:1986 | 13 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $453 | $217 | Implemented |
CO0063 # 01 Y:1986 | 01 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,174 | $300 | Implemented |
CO0063 # 02 Y:1986 | 02 | 1986 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,704 | $2,100 | Implemented |
CO0063 # 03 Y:1986 | 03 | 1986 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $21,545 | $30,000 | Not Implemented |
CO0063 # 04 Y:1986 | 04 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,571 | $1,200 | Implemented |
CO0063 # 05 Y:1986 | 05 | 1986 | IMPROVE LUBRICATION PRACTICES | $8,280 | $0 | Implemented |
CO0063 # 06 Y:1986 | 06 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,622 | $6,000 | Not Implemented |
CO0063 # 07 Y:1986 | 07 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,913 | $0 | Implemented |
CO0063 # 08 Y:1986 | 08 | 1986 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,273 | $200 | Implemented |