Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT0051 # 03 Y:1986 | 03 | 1986 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,811 | $8,000 | Not Implemented |
LT0051 # 04 Y:1986 | 04 | 1986 | REPAIR AND ELIMINATE STEAM LEAKS | $848 | $140 | Implemented |
LT0051 # 05 Y:1986 | 05 | 1986 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,025 | $113 | Implemented |
LT0051 # 06 Y:1986 | 06 | 1986 | OPTIMIZE PLANT POWER FACTOR | $12,627 | $7,140 | Not Implemented |
LT0051 # 07 Y:1986 | 07 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,034 | $422 | Implemented |
LT0051 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,250 | $0 | Implemented |
MA0056 # 01 Y:1986 | 01 | 1986 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,510 | $2,500 | Implemented |
MA0056 # 02 Y:1986 | 02 | 1986 | COVER OPEN TANKS | $157 | $0 | Implemented |
MA0056 # 03 Y:1986 | 03 | 1986 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,812 | $1,700 | Implemented |
MA0056 # 04 Y:1986 | 04 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $566 | $109 | Not Implemented |
MA0056 # 05 Y:1986 | 05 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $2,380 | $1,200 | Implemented |
MA0056 # 06 Y:1986 | 06 | 1986 | INSTALL STORM WINDOWS AND DOORS | $1,206 | $1,760 | Not Implemented |
MA0056 # 07 Y:1986 | 07 | 1986 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $6,965 | $0 | Not Implemented |
KU0190 # 01 Y:1986 | 01 | 1986 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,383 | $50 | Implemented |
KU0190 # 02 Y:1986 | 02 | 1986 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $215 | $0 | Implemented |
KU0190 # 03 Y:1986 | 03 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,038 | $1,510 | Implemented |
KU0190 # 04 Y:1986 | 04 | 1986 | IMPROVE LUBRICATION PRACTICES | $1,009 | $600 | Not Implemented |
KU0190 # 05 Y:1986 | 05 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $658 | $120 | Implemented |
KU0190 # 06 Y:1986 | 06 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $673 | $10 | Implemented |
KU0190 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $249 | $50 | Implemented |
KU0190 # 08 Y:1986 | 08 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $207 | $0 | Implemented |
KU0191 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,594 | $2,592 | Implemented |
KU0191 # 02 Y:1986 | 02 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,988 | $0 | Not Implemented |
KU0191 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $423 | $100 | Implemented |
KU0191 # 04 Y:1986 | 04 | 1986 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $221 | $0 | Implemented |