IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159,725

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0106 # 10 Y:1983 10 1983 USE UTILITY CONTROLLED POWER MANAGEMENT $6,953 $0 Implemented
OK0106 # 11 Y:1983 11 1983 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $68 $0 Implemented
OK0106 # 12 Y:1983 12 1983 USE OPTIMUM THICKNESS INSULATION $28,546 $6,480 Implemented
OK0109 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $411 Not Implemented
OK0109 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,453 $10,800 Not Implemented
OK0109 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $340 Not Implemented
OK0109 # 04 Y:1983 04 1983 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $83 $0 Not Implemented
OK0109 # 05 Y:1983 05 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $450 $1,339 Not Implemented
OK0109 # 06 Y:1983 06 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $62,013 $800 Not Implemented
OK0109 # 07 Y:1983 07 1983 INSTALL TIMERS AND/OR THERMOSTATS $341 $500 Not Implemented
OK0111 # 01 Y:1983 01 1983 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $113 $418 Not Implemented
OK0111 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85 $25 Not Implemented
OK0111 # 03 Y:1983 03 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,146 $22,500 Not Implemented
TN0172 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,165 $3,500 Not Implemented
TN0172 # 02 Y:1983 02 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,755 $0 Not Implemented
TN0172 # 03 Y:1983 03 1983 INSULATE BARE EQUIPMENT $1,360 $13,000 Not Implemented
TN0172 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,063 $700 Not Implemented
TN0183 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,515 $527 Implemented
TN0183 # 02 Y:1983 02 1983 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,500 $5,000 Implemented
TN0183 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $3,810 $2,000 Implemented
TN0183 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $1,268 $1,790 Not Implemented
TN0173 # 01 Y:1983 01 1983 INSULATE BARE EQUIPMENT $411 $200 Not Implemented
TN0173 # 02 Y:1983 02 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,800 $1,000 Not Implemented
TN0173 # 03 Y:1983 03 1983 INSTALL SET-BACK TIMERS $1,600 $0 Not Implemented
KU0092 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $235 $279 Not Implemented