IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0127 # 03 Y:1984 03 1984 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,518 $20,000 Implemented
KU0127 # 04 Y:1984 04 1984 OPTIMIZE PLANT POWER FACTOR $18,864 $28,500 Implemented
KU0127 # 05 Y:1984 05 1984 INSTALL SET-BACK TIMERS $8,943 $5,443 Not Implemented
KU0127 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,298 $0 Implemented
KU0127 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,894 $1,350 Not Implemented
KU0127 # 08 Y:1984 08 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,750 $20 Not Implemented
KU0127 # 09 Y:1984 09 1984 USE MINIMUM STEAM OPERATING PRESSURE $3,645 $0 Not Implemented
KU0127 # 10 Y:1984 10 1984 INSULATE BARE EQUIPMENT $1,267 $1,700 Implemented
KU0127 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $1,116 $300 Implemented
KU0127 # 12 Y:1984 12 1984 REPAIR AND ELIMINATE STEAM LEAKS $187 $60 Implemented
GT0214 # 01 Y:1984 01 1984 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,957 $15,000 Implemented
GT0214 # 02 Y:1984 02 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $1,493 $2,000 Implemented
GT0214 # 03 Y:1984 03 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,406 $10,000 Implemented
GT0214 # 04 Y:1984 04 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,664 $2,000 Implemented
GT0214 # 05 Y:1984 05 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $619 $400 Implemented
GT0215 # 01 Y:1984 01 1984 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,255 $24,000 Implemented
GT0215 # 02 Y:1984 02 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $852 $3,000 Implemented
GT0215 # 03 Y:1984 03 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $1,517 $572 Implemented
GT0215 # 04 Y:1984 04 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,800 $4,000 Implemented
GT0215 # 05 Y:1984 05 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $341 $539 Not Implemented
GT0215 # 06 Y:1984 06 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $437 $1,000 Implemented
GT0215 # 07 Y:1984 07 1984 COVER OPEN TANKS $817 $2,000 Implemented
GT0217 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,387 $200 Implemented
GT0217 # 02 Y:1984 02 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,700 $10,000 Implemented
GT0217 # 03 Y:1984 03 1984 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $188,200 $270,000 Not Implemented