IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164,206

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0024 # 07 Y:1985 07 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $449 $379 Not Implemented
LT0026 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,318 $300 Implemented
LT0026 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,870 $11,300 Implemented
LT0026 # 03 Y:1985 03 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,340 $405 Implemented
LT0026 # 04 Y:1985 04 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,384 $138 Implemented
LT0026 # 05 Y:1985 05 1985 REPAIR AND ELIMINATE STEAM LEAKS $2,460 $15 Implemented
LT0026 # 06 Y:1985 06 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,239 $2,800 Implemented
LT0026 # 07 Y:1985 07 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,208 $300 Implemented
LT0026 # 08 Y:1985 08 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,510 $3,337 Not Implemented
ST0026 # 01 Y:1985 01 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $292 $60 Not Implemented
ST0026 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,867 $40 Not Implemented
ST0026 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $607 $0 Not Implemented
ST0026 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $706 $1,700 Not Implemented
ST0026 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $29,188 $16,200 Not Implemented
ST0026 # 06 Y:1985 06 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $6,181 $0 Not Implemented
ST0026 # 07 Y:1985 07 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,096 $400 Not Implemented
ST0026 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $712 $537 Not Implemented
ST0026 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,391 $682 Not Implemented
ST0026 # 10 Y:1985 10 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $155 $450 Not Implemented
ST0027 # 01 Y:1985 01 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,782 $3,857 Not Implemented
ST0027 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $674 $537 Implemented
ST0027 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,478 $2,138 Not Implemented
ST0027 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,317 $1,900 Not Implemented
ST0027 # 05 Y:1985 05 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $158 $260 Not Implemented
ST0027 # 06 Y:1985 06 1985 IMPROVE LUBRICATION PRACTICES $891 $300 Not Implemented