IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0216 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,561 $127 Not Implemented
GT0216 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $150 Implemented
UD0114 # 01 Y:1984 01 1984 UPGRADE OBSOLETE EQUIPMENT $20,480 $5,070 Implemented
UD0114 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,818 $900 Implemented
UD0114 # 03 Y:1984 03 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $852 $0 Not Implemented
UD0114 # 04 Y:1984 04 1984 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,038 $4,000 Implemented
UD0114 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,377 $33,750 Implemented
UD0114 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,899 $0 Implemented
UD0116 # 01 Y:1984 01 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,546 $27,000 Not Implemented
UD0116 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,320 $3,000 Implemented
UD0116 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,013 $670 Implemented
UD0116 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $18,628 $99,000 Implemented
UD0116 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $28,956 $69,700 Not Implemented
UD0116 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,705 $3,000 Not Implemented
KU0114 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,055 $2,514 Not Implemented
KU0114 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,440 $1,100 Implemented
KU0114 # 03 Y:1984 03 1984 INSTALL TURBULATORS $2,447 $2,080 Not Implemented
KU0114 # 04 Y:1984 04 1984 REPAIR OR REPLACE STEAM TRAPS $3,475 $1,000 Not Implemented
KU0114 # 05 Y:1984 05 1984 AIR CONDITION ONLY SPACE NECESSARY $1,407 $263 Implemented
KU0114 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $310 Not Implemented
KU0114 # 07 Y:1984 07 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,040 $200 Not Implemented
KU0114 # 08 Y:1984 08 1984 INSTALL TIMERS AND/OR THERMOSTATS $1,563 $200 Not Implemented
KU0114 # 09 Y:1984 09 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,002 $1,050 Not Implemented
KU0115 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,417 $100 Implemented
KU0115 # 02 Y:1984 02 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,391 $965 Not Implemented