IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0115 # 03 Y:1982 03 1982 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,747 $400 Not Implemented
GT0110 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $160 $154 Not Implemented
GT0110 # 02 Y:1982 02 1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $842 $1,110 Implemented
GT0110 # 03 Y:1982 03 1982 LOWER CEILING TO REDUCE CONDITIONED SPACE $2,455 $3,730 Implemented
GT0110 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,087 $5,383 Not Implemented
GT0111 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $814 $0 Implemented
GT0111 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $597 Implemented
GT0111 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $25 Implemented
UD0018 # 01 Y:1981 01 1981 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $610 $45 Not Implemented
UD0018 # 02 Y:1981 02 1981 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $9,469 $32,000 Not Implemented
UD0018 # 03 Y:1981 03 1981 USE OPTIMUM THICKNESS INSULATION $445 $0 Implemented
UD0018 # 04 Y:1981 04 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $94 $60 Implemented
UD0018 # 05 Y:1981 05 1981 INSULATE BARE EQUIPMENT $10,990 $10,000 Not Implemented
KU0024 # 01 Y:1981 01 1981 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,669 $2,600 Not Implemented
KU0024 # 02 Y:1981 02 1981 INSTALL TIMERS AND/OR THERMOSTATS $556 $0 Not Implemented
KU0024 # 03 Y:1981 03 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $357 Not Implemented
KU0025 # 01 Y:1981 01 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $100 Implemented
KU0025 # 02 Y:1981 02 1981 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,267 $1,200 Not Implemented
KU0025 # 03 Y:1981 03 1981 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $992 $0 Not Implemented
KU0025 # 04 Y:1981 04 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $685 $2,076 Not Implemented
KU0025 # 05 Y:1981 05 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,689 $3,748 Implemented
KU0026 # 01 Y:1981 01 1981 OPTIMIZE PLANT POWER FACTOR $6,100 $8,200 Not Implemented
KU0026 # 02 Y:1981 02 1981 INSTALL SET-BACK TIMERS $15,466 $16,824 Not Implemented
KU0026 # 03 Y:1981 03 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $500 Not Implemented
KU0026 # 04 Y:1981 04 1981 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $0 Not Implemented