IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0171 # 08 Y:1999 08 1999 $143,173 $137,600 Not Implemented
UD0579 # 01 Y:1999 01 1999 $250,000 $325,000 Not Implemented
UD0579 # 02 Y:1999 02 1999 $25,726 $7,500 Implemented
UD0579 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,050 $8,000 Implemented
UD0579 # 04 Y:1999 04 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $7,690 $2,850 Implemented
UD0579 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,782 $2,000 Not Implemented
UD0579 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $910 $0 Implemented
WI0358 # 01 Y:1999 01 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $97,790 $44,000 Implemented
WI0358 # 02 Y:1999 02 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $92,705 $0 Not Implemented
WI0358 # 03 Y:1999 03 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $54,425 $102,000 Not Implemented
WI0358 # 04 Y:1999 04 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $7,803 $13,900 Not Implemented
WI0358 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,466 $200 Not Implemented
WI0358 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $1,096 $3,850 Not Implemented
WI0358 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $107 Implemented
AR0168 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,016 $608 Implemented
AR0168 # 02 Y:1999 02 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $223 $0 Implemented
AR0168 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $11,649 $7,750 Not Implemented
AR0168 # 04 Y:1999 04 1999 $21,008 $100 Not Implemented
NC0170 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,515 $0 Implemented
NC0170 # 02 Y:1999 02 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $500 Not Implemented
NC0170 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,462 $2,000 Implemented
NC0170 # 04 Y:1999 04 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,763 $200 Not Implemented
NC0170 # 05 Y:1999 05 1999 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $29,116 $20,000 Not Implemented
NC0170 # 06 Y:1999 06 1999 MINIMIZE WATER USAGE $3,900 $50 Not Implemented
MO0263 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,337 $100 Implemented