IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0212 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,075 $9,350 Not Implemented
IC0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,997 $8,799 Not Implemented
IC0218 # 02 Y:2019 02 2019 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $63,690 $6,300 Not Implemented
IC0218 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,151 $14,700 Not Implemented
IC0218 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,883 $8,244 Not Implemented
SD0585 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,052 $8,453 Implemented
SD0585 # 02 Y:2019 02 2019 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,628 $12,000 Not Implemented
SD0585 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $2,603 $200 Implemented
SD0585 # 04 Y:2019 04 2019 USE PHOTOCELL CONTROLS $2,188 $3,520 Not Implemented
SD0585 # 05 Y:2019 05 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,928 $14,000 Not Implemented
MA0807 # 01 Y:2019 01 2019 REDUCE VENTILATION AIR $10,917 $100 Implemented
MA0807 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,356 $9,356 Implemented
MA0807 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,808 $17,300 Not Implemented
MA0807 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,547 $10,850 Not Implemented
MA0807 # 05 Y:2019 05 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,241 $5,413 Implemented
MA0807 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $558 $470 Implemented
GT0927 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $32,534 $4,145 Implemented
GT0927 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,930 $2,500 Implemented
GT0927 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,382 $27,983 Implemented
GT0927 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $5,352 $6,398 Implemented
GT0927 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,141 $1,725,000 Not Implemented
GT0927 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $62,369 $548,847 Not Implemented
WM0136 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $23,987 $106,000 Not Implemented
WM0136 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,803 $4,811 Not Implemented
WM0136 # 03 Y:2019 03 2019 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,529 $1,319 Not Implemented