Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,485
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0212 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,075 | $9,350 | Not Implemented |
IC0218 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,997 | $8,799 | Not Implemented |
IC0218 # 02 Y:2019 | 02 | 2019 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $63,690 | $6,300 | Not Implemented |
IC0218 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,151 | $14,700 | Not Implemented |
IC0218 # 04 Y:2019 | 04 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,883 | $8,244 | Not Implemented |
SD0585 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,052 | $8,453 | Implemented |
SD0585 # 02 Y:2019 | 02 | 2019 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,628 | $12,000 | Not Implemented |
SD0585 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,603 | $200 | Implemented |
SD0585 # 04 Y:2019 | 04 | 2019 | USE PHOTOCELL CONTROLS | $2,188 | $3,520 | Not Implemented |
SD0585 # 05 Y:2019 | 05 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,928 | $14,000 | Not Implemented |
MA0807 # 01 Y:2019 | 01 | 2019 | REDUCE VENTILATION AIR | $10,917 | $100 | Implemented |
MA0807 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,356 | $9,356 | Implemented |
MA0807 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,808 | $17,300 | Not Implemented |
MA0807 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,547 | $10,850 | Not Implemented |
MA0807 # 05 Y:2019 | 05 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,241 | $5,413 | Implemented |
MA0807 # 06 Y:2019 | 06 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $558 | $470 | Implemented |
WM0136 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,987 | $106,000 | Not Implemented |
WM0136 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,803 | $4,811 | Not Implemented |
WM0136 # 03 Y:2019 | 03 | 2019 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,529 | $1,319 | Not Implemented |
WM0136 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $854 | $1,600 | Not Implemented |
WM0136 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $692 | $0 | Not Implemented |
WM0136 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $549 | $0 | Not Implemented |
GT0927 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $32,534 | $4,145 | Implemented |
GT0927 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,930 | $2,500 | Implemented |
GT0927 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,382 | $27,983 | Implemented |