Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0256 # 11 Y:2000 | 11 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $50,000 | $60,000 | n/a |
UF0256 # 12 Y:2000 | 12 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $150,000 | $100,000 | n/a |
SD0256 # 01 Y:2000 | 01 | 2000 | INSTALL SKYLIGHTS | $18,038 | $27,000 | Implemented |
SD0256 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,703 | $7,230 | Implemented |
SD0256 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $205,696 | $64,500 | Not Implemented |
SD0256 # 04 Y:2000 | 04 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,732 | $5,400 | Not Implemented |
SD0256 # 05 Y:2000 | 05 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $290,738 | $0 | Implemented |
NC0199 # 01 Y:2000 | 01 | 2000 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $1,845 | $777 | Not Implemented |
NC0199 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,374 | $7,490 | Implemented |
NC0199 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,516 | $1,070 | Not Implemented |
NC0199 # 04 Y:2000 | 04 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $351 | $102 | Not Implemented |
NC0199 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,352 | $210 | Implemented |
NC0199 # 06 Y:2000 | 06 | 2000 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,140 | $0 | Implemented |
NC0199 # 07 Y:2000 | 07 | 2000 | INSTALL COMMON HEADER ON COMPRESSORS | $26,946 | $118,000 | Not Implemented |
IA0259 # 01 Y:2000 | 01 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,066 | $100 | Not Implemented |
IA0259 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $530 | $1,073 | Implemented |
IA0259 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,277 | $139 | Implemented |
IA0259 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $248 | $58 | Not Implemented |
IA0259 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $120 | $40 | Not Implemented |
IA0259 # 06 Y:2000 | 06 | 2000 | RECOVER AND REUSE SPENT ACID BATHS | $58,747 | $2,500 | Not Implemented |
IA0259 # 07 Y:2000 | 07 | 2000 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $1,445 | $5,020 | Implemented |
IA0259 # 08 Y:2000 | 08 | 2000 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $208 | $30 | Implemented |
IA0259 # 09 Y:2000 | 09 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $132,600 | $250,000 | Not Implemented |
UF0255 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,688 | $862 | Implemented |
UF0255 # 02 Y:2000 | 02 | 2000 | COMBINE UTILITY METERS | $40,200 | $4,100 | Implemented |