Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,573
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0008 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $282 | $107 | Not Implemented |
IP0008 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,510 | $9,972 | Implemented |
IP0008 # 09 Y:2013 | 09 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,093 | $15,665 | Not Implemented |
IP0008 # 10 Y:2013 | 10 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $11,117 | $33,000 | Not Implemented |
UK1215 # 01 Y:2013 | 01 | 2013 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,249 | $2,200 | Not Implemented |
UK1215 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,824 | $4,516 | Implemented |
UK1215 # 03 Y:2013 | 03 | 2013 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $4,021 | $1,610 | Implemented |
UK1215 # 04 Y:2013 | 04 | 2013 | PAY UTILITY BILLS ON TIME | $1,678 | $0 | Implemented |
IP0007 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,164 | $0 | Implemented |
IP0007 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,744 | $0 | Implemented |
IP0007 # 03 Y:2013 | 03 | 2013 | OPTIMIZE PLANT POWER FACTOR | $13,528 | $33,600 | Not Implemented |
IP0007 # 04 Y:2013 | 04 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $46,311 | $151,951 | Not Implemented |
IP0006 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,520 | $0 | Implemented |
IP0006 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $980 | $0 | Implemented |
IP0006 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $1,771 | $730 | Implemented |
IP0006 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,847 | $1,416 | Not Implemented |
IP0006 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $490 | $1,156 | Not Implemented |
IP0006 # 06 Y:2012 | 06 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,261 | $92,692 | Implemented |
IP0006 # 07 Y:2012 | 07 | 2012 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $36,010 | $171,310 | Not Implemented |
IP0005 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $33,112 | $0 | Not Implemented |
IP0005 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,540 | $0 | Implemented |
IP0005 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $683 | $0 | Implemented |
IP0005 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $997 | $1,803 | Not Implemented |
IP0005 # 05 Y:2012 | 05 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,542 | $37,000 | Not Implemented |
IP0004 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,520 | $0 | Implemented |