IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0429 # 02 Y:1998 02 1998 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $4,860 $0 Implemented
CO0429 # 03 Y:1998 03 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $2,930 $800 Not Implemented
CO0429 # 04 Y:1998 04 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $6,000 $10,160 Implemented
CO0429 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $730 $280 Not Implemented
GT0653 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,720 $2,000 Not Implemented
GT0653 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,810 $600 Implemented
GT0653 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $647 $420 Not Implemented
GT0653 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $384 $0 Implemented
GT0653 # 05 Y:1998 05 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $865 $0 Not Implemented
GT0653 # 06 Y:1998 06 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $8,980 $31,660 Implemented
GT0653 # 07 Y:1998 07 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $370,000 $100,000 Implemented
GT0652 # 01 Y:1998 01 1998 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $9,935 $0 n/a
GT0652 # 02 Y:1998 02 1998 METER WASTE WATER $6,890 $1,000 n/a
GT0652 # 03 Y:1998 03 1998 INSTALL STEAM TRAP $2,103 $2,800 n/a
GT0652 # 04 Y:1998 04 1998 UTILIZE OUTSIDE CONTRACTING $4,345 $0 n/a
GT0652 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,000 $250 n/a
GT0652 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,300 $0 n/a
GT0652 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,430 $130,994 n/a
OD0125 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,283 $67,670 Implemented
OD0125 # 02 Y:1998 02 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $704 $840 Implemented
OD0125 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,650 $630 Implemented
OD0125 # 04 Y:1998 04 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,182 $8,000 Not Implemented
OD0125 # 05 Y:1998 05 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,293 $1,295 Not Implemented
OD0125 # 06 Y:1998 06 1998 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $619 $0 Implemented
UF0215 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,048 $40,581 Not Implemented