IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0113 # 01 Y:2001 01 2001 REDESIGN PROCESS $89,000 $44,000 Implemented
SU0113 # 02 Y:2001 02 2001 INCREASE USE OF AUTOMATION $76,400 $90,000 Not Implemented
SU0113 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,676 $705 Implemented
SU0113 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $890 $0 Implemented
SU0113 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $0 Implemented
SU0113 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $319 $115 Implemented
SU0113 # 07 Y:2001 07 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $174 $60 Implemented
LM0016 # 01 Y:2001 01 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $9,494 $2,500 Not Implemented
LM0016 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $50,600 $60,000 Not Implemented
LM0016 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,311 $3,335 Implemented
LM0016 # 04 Y:2001 04 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $18,720 $15,300 n/a
LM0016 # 05 Y:2001 05 2001 $1,482,000 $5,000 Implemented
LM0016 # 06 Y:2001 06 2001 $340,000 $310,000 Implemented
IA0272 # 01 Y:2001 01 2001 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $25,513 $8,420 Not Implemented
IA0272 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,710 $356 Implemented
IA0272 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,186 $209 Not Implemented
IA0272 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $612 $60 Implemented
IA0272 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,418 $8,938 Not Implemented
IA0272 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,142 $1,126 Not Implemented
IA0272 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $1,313 $1,862 Implemented
IA0272 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $337 $740 Not Implemented
IA0272 # 09 Y:2001 09 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,544 $445 Implemented
IA0272 # 10 Y:2001 10 2001 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,127 $254 Not Implemented
IA0272 # 11 Y:2001 11 2001 MINIMIZE WATER USAGE $1,414 $35 Implemented
IA0272 # 12 Y:2001 12 2001 $37,440 $30,000 n/a