IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0702 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $760 $0 Not Implemented
GT0702 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,653 $6,495 Implemented
GT0702 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,778 $9,950 n/a
GT0702 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,295 $82,500 Not Implemented
GT0702 # 06 Y:2000 06 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,350 $6,700 Implemented
GT0702 # 07 Y:2000 07 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $168,000 $0 Not Implemented
GT0701 # 01 Y:2000 01 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,490 $5,000 Not Implemented
GT0701 # 02 Y:2000 02 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $23,600 $2,200 Not Implemented
GT0701 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,842 $9,456 Not Implemented
GT0701 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,420 $25,117 Implemented
GT0701 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $2,219 $0 Implemented
GT0701 # 06 Y:2000 06 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,845 $0 Implemented
GT0701 # 07 Y:2000 07 2000 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $36,500 $28,000 Not Implemented
GT0701 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $1,234 $2,999 Not Implemented
GT0700 # 01 Y:2000 01 2000 COMBINE UTILITY METERS $2,238 $5,018 Not Implemented
GT0700 # 02 Y:2000 02 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $193 $330 Not Implemented
GT0700 # 03 Y:2000 03 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $170 $0 Implemented
GT0700 # 04 Y:2000 04 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $715 $2,240 Implemented
GT0700 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $675 Not Implemented
GT0700 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,105 $4,013 Implemented
GT0700 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,576 $15,200 Implemented
GT0700 # 08 Y:2000 08 2000 METER WASTE WATER $2,620 $500 Implemented
GT0700 # 09 Y:2000 09 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $620 $2,490 Implemented
GT0700 # 10 Y:2000 10 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $250,000 $180,000 Not Implemented
GT0699 # 01 Y:2000 01 2000 ELIMINATE SHIFT $244,498 $0 n/a