IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,738

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0030 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $391 $106 Implemented
AR0030 # 04 Y:1994 04 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $21,447 $19,000 Not Implemented
AR0028 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,571 $300 Implemented
AR0028 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,490 $7,600 Implemented
AR0028 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $913 Implemented
AR0028 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,367 $495 Implemented
AR0028 # 05 Y:1994 05 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $37,510 $30,000 Not Implemented
AR0028 # 06 Y:1994 06 1994 AIR CONDITION ONLY SPACE NECESSARY $2,792 $1,000 Implemented
AR0026 # 01 Y:1994 01 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $864 $224 Implemented
AR0026 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,061 $940 Implemented
AR0026 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,747 $862 Implemented
AR0026 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,417 $1,000 Implemented
AR0026 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,575 $700 Implemented
AR0026 # 06 Y:1994 06 1994 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $18,986 $100 Not Implemented
AR0026 # 07 Y:1994 07 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $22,438 $30,500 Not Implemented
AR0027 # 01 Y:1994 01 1994 REPAIR AND ELIMINATE STEAM LEAKS $56,354 $5,100 Implemented
AR0027 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,424 $756 Implemented
AR0027 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,396 $180 Implemented
AR0027 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,362 $699 Implemented
AR0027 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $52,744 $41,355 Implemented
AR0027 # 06 Y:1994 06 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $10,636 $2,021 Implemented
AR0027 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,289 $2,750 Implemented
AR0027 # 08 Y:1994 08 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,724 $0 Implemented
AR0027 # 09 Y:1994 09 1994 CLOSE OFF UNNEEDED STEAM LINES $4,040 $100 Implemented
AR0027 # 10 Y:1994 10 1994 INSULATE BARE EQUIPMENT $7,086 $11,543 Implemented