Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0207 # 11 Y:2004 | 11 | 2004 | RECOVER AND REUSE COOLING WATER | $11,194 | $32,000 | Not Implemented |
LL0207 # 01 Y:2004 | 01 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $36,769 | $16,000 | Implemented |
UU0076 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,600 | $2,000 | Not Implemented |
UU0076 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24 | $40 | Not Implemented |
UU0076 # 03 Y:2004 | 03 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30 | $0 | Not Implemented |
UU0076 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $4,824 | Not Implemented |
UU0076 # 05 Y:2004 | 05 | 2004 | METER WASTE WATER | $5,360 | $1,500 | Not Implemented |
UU0076 # 06 Y:2004 | 06 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,982 | $2,220 | Not Implemented |
OK0699 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,780 | $6,150 | Implemented |
OK0699 # 02 Y:2004 | 02 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $8,145 | $24,175 | Implemented |
OK0699 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,446 | $23,400 | Implemented |
OK0699 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,440 | $18,681 | Implemented |
OK0699 # 05 Y:2004 | 05 | 2004 | INSTALL SET-BACK TIMERS | $6,489 | $3,960 | Implemented |
OK0699 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $418 | $520 | Implemented |
OK0699 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $324 | $707 | Implemented |
OK0699 # 08 Y:2004 | 08 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $4,470 | $0 | Implemented |
NC0305 # 01 Y:2004 | 01 | 2004 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $36,051 | $3,500 | Not Implemented |
NC0305 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,108 | $200 | Not Implemented |
NC0305 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,452 | $2,000 | Not Implemented |
NC0305 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,897 | $2,750 | Not Implemented |
NC0305 # 05 Y:2004 | 05 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,802 | $1,000 | Not Implemented |
NC0305 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $349 | $100 | Implemented |
NC0305 # 07 Y:2004 | 07 | 2004 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $320 | $58 | Implemented |
MS0265 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,775 | $59,467 | Implemented |
MS0265 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,523 | $32,157 | Not Implemented |