IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0218 # 07 Y:2002 07 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,604 $2,500 Implemented
UM0218 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $2,470 $800 Implemented
UM0218 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,415 $36,321 Not Implemented
UM0218 # 10 Y:2002 10 2002 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,185 $100 Implemented
UM0217 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $396 $75 Implemented
UM0217 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $600 Implemented
UM0217 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $800 $1,170 Not Implemented
UM0217 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $290 $680 Implemented
UM0217 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,326 $2,100 Not Implemented
UM0217 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $300 $50 Not Implemented
UM0217 # 07 Y:2002 07 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,860 $2,500 Implemented
UM0217 # 08 Y:2002 08 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $2,050 $1,350 Implemented
UM0216 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,873 $1,125 Not Implemented
UM0216 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $500 Not Implemented
UM0216 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,056 $500 Not Implemented
UM0216 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,000 $2,000 Not Implemented
UM0216 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $222 $620 Not Implemented
UM0216 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,496 $7,269 Not Implemented
UM0215 # 01 Y:2002 01 2002 RECYCLE CASTING SAND $12,300 $50,000 Not Implemented
UM0215 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,824 $1,000 Not Implemented
UM0215 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $980 $225 Not Implemented
UM0215 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $730 $1,000 Not Implemented
UM0215 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $366 $31 Not Implemented
UM0214 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $5,260 $4,500 Not Implemented
UM0214 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $142,000 $30,400 Implemented