IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0521 # 05 Y:1999 05 1999 AUTOMATE FINISHING PROCESS $68,610 $109,420 Implemented
SD0234 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,609 $25,688 Not Implemented
SD0234 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $26,750 $21,265 Not Implemented
SD0234 # 03 Y:1999 03 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,768 $13,000 Not Implemented
SD0234 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,069 $1,425 Implemented
SD0234 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,471 $7,825 Not Implemented
SD0234 # 06 Y:1999 06 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,739 $3,334 Not Implemented
SD0234 # 07 Y:1999 07 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $151 $0 Not Implemented
SD0234 # 08 Y:1999 08 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $8,640 $510 Not Implemented
SD0234 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $119,957 $150,000 Not Implemented
SD0233 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $331 $725 Implemented
SD0233 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,292 $360 Implemented
SD0233 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $940 $584 Implemented
SD0233 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,392 $1,394 Implemented
SD0233 # 05 Y:1999 05 1999 MAINTAIN MACHINES TO REDUCE LEAKS $6,160 $0 Implemented
SD0233 # 06 Y:1999 06 1999 AUTOMATE FINISHING PROCESS $67,000 $9,000 Not Implemented
OD0141 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,532 $15,691 Not Implemented
OD0141 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $87 $160 Not Implemented
OD0141 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $495 $120 Not Implemented
OD0141 # 04 Y:1999 04 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $138,300 $69,125 Not Implemented
UD0577 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $640,050 $1,000,000 Not Implemented
UD0577 # 02 Y:1999 02 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $320,742 $525,000 Not Implemented
UD0577 # 03 Y:1999 03 1999 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $118,825 $15,000 Not Implemented
UD0577 # 04 Y:1999 04 1999 RECOVER AND REUSE WASTE MATERIAL $88,813 $200,000 Not Implemented
UD0577 # 05 Y:1999 05 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $35,600 $57,000 Not Implemented