IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0253 # 03 Y:2003 03 2003 AVOID REWINDING MOTORS MORE THAN TWICE $694 $432 Not Implemented
NC0253 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $130 $48 Not Implemented
NC0253 # 05 Y:2003 05 2003 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $5,046 $2,000 Not Implemented
NC0252 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,411 $20,000 Not Implemented
NC0252 # 02 Y:2003 02 2003 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,800 $6,000 Implemented
NC0252 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $240 $100 Not Implemented
NC0252 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,917 $400 Implemented
NC0252 # 05 Y:2003 05 2003 REDESIGN PROCESS $4,814 $780 Implemented
NC0252 # 06 Y:2003 06 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $780 $1,000 Implemented
NC0252 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $130 $350 Not Implemented
NC0247 # 01 Y:2002 01 2002 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $44,473 $120,000 Implemented
NC0247 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $1,646 $540 Implemented
NC0247 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,600 $2,665 Implemented
NC0247 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $591 $1,597 Not Implemented
NC0247 # 05 Y:2002 05 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,011 $7,795 Not Implemented
NC0247 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $100 Implemented
NC0247 # 07 Y:2002 07 2002 DEVELOP A REPAIR/REPLACE POLICY $774 $863 Implemented
NC0247 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,850 $1,004 Implemented
NC0247 # 09 Y:2002 09 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $860 $500 Implemented
NC0251 # 01 Y:2002 01 2002 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $29,079 $130,000 Not Implemented
NC0251 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $50,797 $100,000 Not Implemented
NC0251 # 03 Y:2002 03 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,593 $7,000 Not Implemented
NC0251 # 04 Y:2002 04 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $6,367 $10,000 Implemented
NC0251 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $4,768 $10,000 Implemented
NC0251 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $137 $574 Implemented